Step 1 of 7: Approve the bill of materials

Stage 1 of 2Define what you build

Approve the bill of materials

  1. Who approved it

    The approver and the approval date are recorded on the BOM. From then on it is locked.

    Read the help article
  2. A planning cost

    The total uses the components' current cost. The real cost of a batch is known when its work order is completed.

    Read the help article

Open Manufacturing › Engineering › Bills of Materials and open the product's BOM. It lists every Component one batch consumes, with its quantity, unit, Scrap % and Cost.

Approval locks the recipe: an approved BOM cannot be edited, and only one BOM per product is active at a time. To change it, you Clone it into a new version and approve that. Work orders already created keep their own copy of the materials.

For a contractor building control panels, this means every panel of the same type is built and costed from one agreed list.