Rocket ERP costs manufactured products at their actual cost. Everything a work order consumes is collected in a work-in-progress (WIP) account. When the order is completed, the finished goods take that whole balance. The product's average cost is then updated, so the next sale is costed at what production really cost.

What goes into the cost

Element

How it is measured

When it is charged

Materials

Issued quantity × the item's current cost

When materials are issued

Labor

Operation hours × the routing's labor rate

With each production report, or at completion

Overhead

Operation hours × the routing's overhead rate

With each production report, or at completion

Operation hours are the setup time plus the run time for the quantity produced. Labor is part of the product cost. It is never left as a separate expense: the labor cost account, or the supplier's account for an outsourced work center, is credited, and the cost sits in WIP until the finished goods absorb it.

The cost card of a work order with estimated and actual cost, material, labor and overhead

The work order's Cost card shows the estimate and the actual figures. Its note Labor is folded into product cost. states the same rule.

During production

Each production report moves the cost of the newly finished units from WIP to finished goods at the order's planned unit cost, which is the estimated material and labor per unit. This keeps every batch at the same unit cost while the run is in progress. If Post on completion is on in the settings, these entries wait until completion.

At completion

  1. The system adds up everything charged to the order.

  2. It deducts the value of by-products (quantity × the by-product's cost) and of recoverable scrap. Those items enter their warehouses at that value.

  3. The rest is the cost of the good units, less what the production reports already moved to finished goods.

  4. Spoilage:

    • Normal spoilage stays in the cost of the good units, so each good unit carries a share of the expected loss.

    • Abnormal spoilage is charged to the abnormal spoilage account. The good units carry only their own share.

  5. The finished product's average cost is recalculated: the value of the stock already held plus the new cost, divided by the total quantity. Scrap and by-product warehouses are left out of this calculation. See How average cost works.

Unused issued materials go back to their source warehouse, and their value goes back with them.

The journal entries

Event

Debit

Credit

Materials issued

Work-in-progress account

Source warehouse's inventory account

Labor charged

Work-in-progress account

Labor cost account, or the subcontractor's payable

Overhead charged

Work-in-progress account

Manufacturing overhead account

Finished goods received

Finished goods account

Work-in-progress account

Scrap reported

Scrap expense account

Work-in-progress account

Abnormal spoilage

Abnormal spoilage account

Work-in-progress account

Unused materials returned

Raw material account

Work-in-progress account

Cancelling or reversing an order posts the mirror entries.

Common questions

Why did the product's cost change after a work order? The average cost now includes the new batch at its actual cost.

Why is the actual cost different from the BOM cost? The BOM shows the components at today's cost only. The actual cost includes labor, overhead, the real quantities consumed, scrap and the cost of materials at the moment they were issued.