Production

Follow a work order from its page

Read a work order's progress, quantities, schedule and cost, its operations, materials, inspections, notes, activity and reservations, and print it.

Where to find itManufacturingProductionWork Orders

3 min readLast updated

The work order page brings together everything about one order: where it stands, what it has consumed, what it has cost so far and who did what. The lifecycle buttons sit at the top. This article explains the rest of the page.

Open a work order

  1. Open Manufacturing › Production › Work Orders.

  2. Use the search box or the status, priority and type filters to find the order, then click its row.

A work order page with production progress, details, cost and the tabs

The top of the page

  • Production progress shows the completed quantity against the planned quantity, as a bar and a percentage.

  • The details, quantities and schedule cards show the product, BOM and routing, warehouses, priority and type, the planned, completed and scrapped quantities, and the planned and actual start and end dates.

  • The Cost card shows the estimated cost, the actual cost and how it splits into material, labor and overhead, with the planned unit cost. The note Labor is folded into product cost. reminds you that labor is part of the finished product's cost, not a separate charge.

The tabs

Tab

What you see

Operations

Each operation in sequence with its Work Center, Labor Hours, Machine Hours, Actual setup (hrs), Actual run (min), Completed qty, Scrapped qty and Labor Cost. Hours marked as estimated come from the routing because no shop floor actuals were recorded.

Materials

Each component with its SKU and Unit, and the Planned Qty, Reserved qty, Issued Qty, Consumed Qty, Returned qty and Scrapped qty, with Unit Cost and Total Cost.

Quality Inspections

The inspections recorded against the order, with the Inspector and the quantities Inspected, Passed and Failed.

Production Notes

Notes added by the team.

Activity

Every inventory, accounting and status event, with the User and time.

Reservations

The stock reserved for the order, per Warehouse, with the Reserved qty and the quantity consumed.

Add a production note

  1. Select Add note.

  2. Choose the Note type: update, issue or resolution.

  3. Write the Note and select Add note.

Notes are a simple way to hand over between shifts. They do not change any figures.

Choose the paper size next to Print, then select Print. The printout shows the order's details, operations, materials and cost.

Common questions

Why is the actual cost zero? The order has not posted cost yet. This happens when Post on completion is on and the order is not completed, or when Post to accounting is off in the settings.

Why does Reserved qty stay at zero? Auto-reserve materials was off when the order was released.